damon wayans puts an ocean-view address up for sale in santa monica - glass partitions for sale

by:EBUNGE     2020-02-18
damon wayans puts an ocean-view address up for sale in santa monica  -  glass partitions for sale
Earlier this year, Damon Wayans moved to a larger residence in Hancock Park, where he was set to separate from the sea view in the West End.
The comedian put his apartment in Santa Monica on the market for $6. 5 million.
At this price, the comedian has more than doubled his money in the apartment.
Records show he bought the property for $3 million in 2005. The 3,093-square-foot pied-a-
Terre is 16-
The unit building built in 1997 is one of the only four penthouse buildingsfloor condos.
Open floor plan includes formal dining room, living room with fireplace, dining area
In the kitchen, two bedrooms and 2. 5 bathrooms.
A study room is currently used as a media room/office and there is a closed laundry room next to the kitchen.
Main suite, two walks-
In the closet, he and her bathroom and fireplace can see the parlyside Park and the coastline. An ocean-
Common area and master bedroom share facing balcony.
Other benefits of the apartment include 24-
Enjoy an hour concierge service, fitness facilities and a rooftop lounge with a swimming pool.
The unit includes two parking spaces.
Curt Northrup and John Iglar of Teles Properties hold the list.
Entertainment is a family business for Wayans.
His siblings include actor Malone Wayne, Keane ivory Wayne, Sean Wayne, and Dwayne Wayne.
He's the father of little ATO Damon Waynes. ; actor-writer-
Producer Damien Dante Waynes is his nephew. The 55-year-
The old man started in the stands.
In 1990, he and his brother Keenan created the comedy "The Color of Life. "
Among his works is the comedy film Major Payne (1995)
And "Blankman "(1994)
And the TV series "My wife and children" (2001-05).
During the parade, Wayans closed a home at Hancock Park for $5. 35 million. Traditional-
The style compound was built in 1949 and has been extensively updated, including a main building, a guest house, a swimming pool and a swimming pool on nearly half an acre --
Have enough space immediatelyand extended-
Family party.
TV doctor change scene
Director Eriq La Salle is known for his role as a doctor.
Peter Benton is growing.
The running series "ER" bought a home in Belle-Air for $3. 03 million.
Sitting on the top of a Stone Canyon Reservoir
The ranch house in shape can see the surrounding slopes, mountains and seas.
The steps extend down the slope to the path and the reservoir below.
In the white area of 2,400 square feet
The enclosed space is a central living/dining room
There are three bedrooms and three bathrooms.
There is also a suite bedroom in the hotel.
Rows of sliding glass doors leading to multiple terraces, garden beds, lawns and swimming pools. A two-
The car garage is located at the entrance of the home.
On April, the house went public for $3.
0. 495 billion, the record shows.
The seller is TV and film producer Ralph Singleton and his wife, screenwriter Joan Singleton.
Amy Colvin Kaz of John athoe Group is a listing agent.
Andrew Dinsky of PLG Estates represents La Salle.
La Salle, 53, has a large number of TV and film credits and some credits for directing and making.
He appeared in 1988 films, "coming to America," and starred in the "genius" and "Under the Dome" series.
It is reported that he will join the cast of the third Wolverine movie.
Their house is no longer what traditional hitNick Carter wants.
Backstreet Boy singer-
Song writer and his wife, actress Lauren Kitt Carter, put their property behind Gates, who is hidden in the market for $4. 25 million. Traditional-
The style home, built in 1956, has been located in 1 since its renovation.
There are 32 acres of garden with newly built guest houses.
The chicken house built in the style of the main house also sits on the ground.
Driven by private, 5,200-square-
Foot house has a classic and modern look. Wide-
Eye-catching details include hardwood floors on board, beam ceilings, and pastel tones.
Vibrant Kolkata marble bathroom and kitchen table top.
The living area includes an open large room, dining room, chef's kitchen, study/office and game/family room with aquarium.
Oversized master suite
Fireplace, two walks
Wardrobe and steam shower-
There is a balcony overlooking the ground.
Sliding glass door from main floor to covered patio with firepit feature.
Stone steps to the pool and spa.
The Carter family bought the house for $3 a year ago.
65 million, the record shows.
Andrew motaza of Keller Williams Real Estate holds the property.
Carter, 36, has been with Backstreet Boys since 1993 and has released three personal records.
He and the band are reportedly making the ninth studio album, which will be released later this year.
Kitt Carter hosted the fitness series "Kitt Fit" on YouTube and also appeared on the daytime series "One Life to Live.
She recently appeared with her husband in the Syfy movie Death 7.
"The South Bay area was hit by QBFormer professional soccer players and Hyman --
Quarterback matt leinaras bought a house at Manhattan Beach for $2. 245 million.
Leinart's new two is located near Mira Costa High School
Story home is about 3,600 square feet-
Room a little more than 2,135 nearbysquare-
He sold his foot last year.
Interesting features include a lit basketball half
An outdoor pool, an outdoor pool, and a spa center.
A piece of grass and two pieces
The car garage is in front of a house built in 1995.
Other details to note include vaulted ceiling, chandelier fixtures, and width
Wooden floor.
Living room with fireplace leads to formal dining room and adjacent Center-island kitchen.
There is also a great room, an office, five bedrooms and four bathrooms at home.
Main suite, walking distance-
There is a fireplace and Jacuzzi in the closet with windows overlooking the wall and the hedge floor.
The property was sold for $2 on April. 299 million.
More than a decade ago, it turned around for $1.
0. 419 billion, the record shows.
In January, Rhine, a partner trust property, became a listed agent.
Nicholas Schneider at Palm properties boutique hotel.
The 32-year-old Leinart was an outstanding student at Santa Ana Mater Dei High School and later won a member of the University of Southern California Troy aHeisman Trophyas.
The former first
After six seasons with the Arizona Cardinals, Houston Texas and Oakland raids, the NFL draft retired in 2014.
He is currently a studio analyst at Fox Sports Academy football coverage.
Looking for heirs for his Malibu Thrace philanthropist Steve Hilton, the grandson of the late hotel pick-up Conrad Hilton and former president of Conrad N.
The Hilton Foundation put his beach house in Malibu on the market for $10. 4 million.
Discover the colony in menmalibu Bay, three-
The story house was renovated by architect Jay Vanos in 2010 and has surfing features
Facing deck extending from each floor.
Take in the views of the nearby Paradise Bay Marina, the coastline and the island of Catalina.
3,385 square feet of exquisite interior with floor walls-to-
Ceiling glass, light hardwood floors and cabinets similar to art installations.
A round staircase surrounds a custom salt water aquarium at the entrance of the home, adding an exotic touch.
Open living room with fireplace, modern chef kitchen, office/study, four bedrooms and three bedrooms.
There are 5 bathrooms in the floor plan.
Fireplace, seating area and glass in main suite
Enclosed steam shower.
Sunroof and glass partition filter natural light throughout the room.
Next to the entrance is a walled courtyard with a tiled hot tub and an outdoor fireplace.
And an additional two-car garage.
Hilton bought the house in 2007 for $7 from the estate of the late actor Robert Ridgley. 1 million.
As an avid surfer, he intends to find a new home near his favorite place. Kate Pritchett-
King of Pritchett
Rapf & Associates holds is available.
Join Conrad N by Hilton
In 1983, the Hilton Foundation was responsible for the foundation's humanitarian work on a global scale.
Prior to his retirement at the end of 2015, he served as president and president of the Foundation. neal.
Leitereg @ latimes.
Custom message
Chat Online 编辑模式下无法使用
Chat Online inputting...