after a chic first home? we’ve found it for you - partition walls for home

by:EBUNGE     2019-08-19
after a chic first home? we’ve found it for you  -  partition walls for home
At the Vista Parade, the unique home Atlanta 3 show at West Ford Heights.
Picture: Nick Clayton
Source: Australian news group if I am single, maybe a few years younger, or a few years old, find a smart, new first or second home, call my own home, I think it will be a serious competitor.
Everything I have is about a home, it feels good when you walk into it, and on a recent visit to the unique home Atlanta 3 show in Vista, West Ford Heights, that's what it does
Even in the cold winter, the weather is very active.
This design is a compact design-ideal for Villa blocks as small as 400sqm-but it does have a very pleasant Scandi vibe, calm and bright space a large main living area and 2 high. 7m ceilings.
They have had a huge impact on the feeling of this home and I like it.
At the Vista Parade, the unique home Atlanta 3 show at West Ford Heights.
Picture: Nick Clayton
Source: Australian news group Atlanta 3 is the perfect size for young buyers and retired buyers, and is a forward-looking design that can cope with changes in life over the next few years.
Yes, these are three.
The design of the bedroom is not four, but by the time you walk by, it is not a real problem unless you already have three children.
Having said that, I believe that if you need another bedroom and your block size allows, the flexibility of the unique family will be happy to add another bedroom.
At the Vista Parade, the unique home Atlanta 3 show at West Ford Heights.
Picture: Nick Clayton
Source: Australian News Corporation. It has three bedrooms, beautifully decorated and feels spacious with large windows, soft dark carpets and double bedrooms under its feet
Wardrobe (door hinge)minor bedrooms)
I think it's a pleasure because I like the service they provide.
Considering what the statisticians said, we spent one.
The third sleep in our lives, a good bedroom does make a difference in the long run.
The Atlanta 3 master bedroom is located in front of this design and feels quiet and quiet, with three tall windows enhancing its many aesthetic touches.
At the Vista Parade, the unique home Atlanta 3 show at West Ford Heights.
Picture: Nick Clayton
Source: Australian news group, large blinds, spacious rooms, elegant. This room is the place I can imagine, it will be quiet when you lie down in the morning and think about getting up. A walk-
It can be expected and delivered in the wardrobe, but the impressive thing is its ensuite.
There is a neat main bathroom at the back of the design (
Shower/tub and vanity, separate toilet)
But this suite is very big, at least not what I expected.
The long vanity with four cabinets provides a pile of storage, as well as a corner shower and a toilet, in proportion to what you can swing a cat. . .
Or spin around in your favorite party dress.
At the Vista Parade, the unique home Atlanta 3 show at West Ford Heights.
Picture: Nick Clayton
Source: once you have a beauty sleep, the Australian news group will spend most of your time surrounding the large living area at the back-one of the two living spaces in the Atlanta 3 design.
The area is completely private with a family lounge, dining space and modern Scandi Kitchen even in the courtyard block.
Xue Cameron, the sales manager of the unique home, said
Part of his favorite Atlanta 3 design.
"The huge open area of the kitchen-I think we're too big," he laughs . ".
"There are two living areas in this type of design that are not typical-visitors are surprised by the Tardis of the space.
"At the Vista Parade, the unique home Atlanta 3 show in West Ford Heights.
Picture: Nick Clayton
Source: Australian news group size becomes obvious when you walk in this rear
Facing the living area, in this case it has a double facing with the outdoors, north and west.
The glass wall on both sides of the sliding door completely brings in the neatly trimmed, compact garden, which can be used as an outdoor extension due to all the windows.
Open-ended living in the West also has high windows
Facing the side wall next to the restaurant, plus a splash window in the kitchen, it's a real treat.
At the Vista Parade, the unique home Atlanta 3 show at West Ford Heights.
Picture: Nick Clayton
Source: Australian news group during my visit, in the winter, the sun came in and felt like a beautiful blessing, I must say, I was wandering in the kitchen for a while and enjoying the warmth
Like the Scandi styling, the lights in this home are beautiful and popular, and it's easy to see how important builders have considered how people want to live, and how important natural light is in this equation.
"This is a popular choice for many age groups," Shane said . ".
"We have received very good feedback so far.
"The house has been decorated with popular colors and simple Scandi furniture, and there is no over-display so that you can really see the house you want.
"At the Vista Parade, the unique home Atlanta 3 show in West Ford Heights.
Picture: Nick Clayton
Source: The Australian news group says that since the kitchen is one of Atlanta's surprising assets, it does need help with further design.
Kitchen style with decent island bench, glass splashes and bank above
Stylish matt black counter cabinet, it's as cool as you 'd like and full of storage.
Did I mention a walk-in pantry?
Imagine a decent room with a bunch of open shelves on both sides of the far end, while a bench on the other end, the cabinets below and the featured shelves in what I call a beautifully decorated wood laminated finish, you will be found.
Although it adds a lot to this sleek kitchen, it's beenso-
Cool island bench completed (with slab ends)that wows.
It looks like concrete and when you put your hand on it even feels like concrete, it's cool to touch with a texture finish that's not rough but can remind you of real things.
At the Vista Parade, the unique home Atlanta 3 show at West Ford Heights.
Picture: Nick Clayton
Source: Australian news group, except this is one of the latest laminate finishes-I love it.
It is only after careful examination that you realize that this is not true, but it does not matter because you may only get a fraction of the cost of the full effect.
"The house is our gold spec with some upgrades-overhead cabinets and range hoods, and a good mix of options," Shane said . ".
The rest of the living space is equally appealing and comes with sections above the standard ceiling.
I also like to show a large corner sofa, which shows that the area can even accommodate the largest furniture.
In the middle, the second lounge is open, but the partition wall makes it a room --
Just like optimizing the extra space in the lobby.
A tall long window ensures privacy, as it does in the North
The West Wind is a bonus and a reward.
@ Smhomemagorially as first
Looking for buyers of fashion homes?
Custom message
Chat Online 编辑模式下无法使用
Chat Online inputting...