6 smart ways to work your square footage - movable walls for home

by:EBUNGE     2019-08-27
6 smart ways to work your square footage  -  movable walls for home
Houbuckenmeyer, Houzz is increasingly contributing to new homes.
According to US data, the average size of American homes built in 2013 was 2,600 square feet, larger than ever before. S. Census Bureau.
While it may be nice to have such a spacious home, many of us lived in older houses built in the early part of the last century, and the smaller floor plans reflect the conventions of different eras.
Many people also continue to flock to the urban environment, where the living space is usually smaller.
So how do you make a smaller home feel bigger?
If your space is limited, consider these design solutions to improve the livability of your home. 1. Fake a foyer.
Did your front door enter the living room?
Tired of seeing the explosion of coats, shoes and backpacks from the sofa?
You can still create the feeling of the foyer by introducing some space
Define elements. The partial-
The high walls, oversized columns and benches allow the entrance not to overflow into the dining area outside.
The reduced ceiling and decorative lights further define the space inside the larger room.
18 ways to make small spaces look bigger.
Create a movable wall. Full-
The height sliding door can create independent, flexible space for sleep and life.
This strategy is especially useful for small niches in larger rooms.
In this House, the children's open play room can be quickly converted into guest rooms thanks to a sliding barn
Style door and pulldown bed. 3.
Consider Juliet's balcony.
In urban environments, there are few things that are more valuable than outdoor spaces --
No matter how small it is
However, being close to the property line or budget constraints may limit your ability to build an outdoor balcony or deck.
Large sliding doors or-
A swing patio door with a small railing on the surface of the building can create a miniature outdoor space that provides fresh air breathing and connection to the outdoors.
This works particularly well on the upper level, adding an actual deck on the upper level can be a complex and costly structural effort.
The railing of Juliet's balcony needs to be attached to the wall to meet the requirements of the building code, allowing you to enjoy the beautiful scenery safely at close range.
Just as any new door or window opens, you will consider proper weather seals to keep the outdoors where it belongs. 4.
Only one bathroom?
Add another door.
Only one bathroom is a common challenge in the old house.
If this is the only bathroom in the house, can you still have the main bathroom?
Alternatively, the bathroom can only be reached through your bedroom.
In this project, a door is added between the bedroom and the reconfigured bathroom, creating the functionality of the main suite while allowing access from the lobby. Find more
When arranging multiple doors in a small bathroom, their location needs to be carefully planned so that the doors do not collide with each other.
Pocket doors can be useful if the space is tight.
Before creating a new opening on an existing wall, consult a building professional to help you assess whether the wall is load-bearing and whether structural improvements are required. 5.
Use the skylight to increase the clearance height.
Stairs with limited clearance space can be very uncomfortable to use and may prevent you from making the most of the rooms on the upper level.
Sometimes this low clearance is only a problem for a small area of the top landing.
Raising the roof or adding dormer can be a very expensive solution for such a small area. But a well-
The skylight placed can be used to raise the ceiling height where it is most needed.
It also lights up the room and provides an opportunity for ventilation.
An architect or engineer can help you evaluate how to add openings to the roof structure.
You would also like to consult your local building code for the minimum clearance height required for the stairs. 6.
Relax on the upper. Wall-
Hanging cabinets above the counter are one of the most common features in kitchen design.
But having too many upper cabinets in the kitchenette makes the space feel limited.
Consider replacing these blank boxes with something more unexpected, such as an open shelf or a pile of windows.
This change can turn a dark kitchen into your favorite room.
However, eliminating the upper cabinets does not mean reducing storage space.
The open shelves can easily store those items that are most used, while also giving the room more visual depth.
In this example, the tile tailgate continues behind the shelf until the ceiling.
This simple move provides a dramatic focus and also makes the room feel higher. 10 big space-
Custom message
Chat Online 编辑模式下无法使用
Chat Online inputting...