Home  >  Quality PRODUCTS For sell  >  Certificated Acoustic Panels Factory  >  Top Grooved Wooden Acoustic Panels Company  > 

acoustic panel material insulation materials Bunge Brand

acoustic panel material insulation materials Bunge Brand

acoustic panel material insulation materials Bunge Brand
  • acoustic panel material insulation materials Bunge Brand
  • acoustic panel material insulation materials Bunge Brand
  • acoustic panel material insulation materials Bunge Brand
  • acoustic panel material insulation materials Bunge Brand
  • acoustic panel material insulation materials Bunge Brand

acoustic panel material insulation materials Bunge Brand

Model
BG grooved wall panels
Brand Name
BUNGE
Year of Establishment
2011
Original
Guangzhou,China
Payment Terms
T/T is common for us. Western union is also ok
Delivery Time
15-30 days based on the different places
Supply Ability
50000 square meters
MOQ
No MOQ
Packing Details
Paper carton
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Product name: Grooved acoustic wall panels
Feature: Sound absorbing
Finish: Melamine,veneer
Application: Hotel,banquet hall,conference room,office
General use: Sound proofing materials
Material: MDF
Function: Noise reduction
Size: 2440*133 mm, 2440*197 mm
Color: Can be customized
Style: Modern
Application Scope
movable walls has a wide range of applications.Guangdong Bunge Building Material Industrial Co.,Ltd is rich in industrial experience and is sensitive about customers' needs. We can provide comprehensive and one-stop solutions based on customers' actual situations.Guangdong Bunge Building Material Industrial Co.,Ltd runs multi fully automated production lines and produces movable walls according to the national building materials standard. Diverse in product line and favorable in price, our products are safe and eco-friendly and enjoy a wide recognition in the market. They are available in a wide range of styles and specifications for various scenarios. Choosing the right product can bring its maximum effect and create a good user experience.
  • Bunge-Acoustic Sound Panels | Fireproof Veneer Ceiling Sound Absorbing Wall Boards
Company Advantages
1. It is acoustic panel material that contributes to the uniqueness of our sound absorbing panels. The product offers a thorough partition from the ceiling to the floor
2. Bunge sets a good example for the industry in terms of the quality of this product. It is manufactured according to environmental protection requirements
3. The strict quality management system ensures the product to maintain a desired level of excellence. Defects will not be founded in the product after it is strictly inspected
4. The product is popular in the market due to a broad marketing channel. Equipped with a sealing device, the product is praised for its tight sealing performance

Fireproof Veneer Ceiling Sound Absorbing Wall Boards Cinema Wood Grooved Acoustic Panels

Grooved Wall Panels Performance


Absorption is usually defined in terms of an absorption coefficient(usually denoted by the Greek letter alpha, α), defined as the ratio of absorbed to incident sound energy from a single interaction between a sound wave and a certain material. Absorption coefficients range from 0 to 1 and vary with frequency, α=0 means that the material absorbs no sound and reflects all sound energy incident on it. α=1 means that the material absorbs all sound energy incident on it and reflects none.

 

Absorption coefficients of 0 and 1 are ideal values that do not exist in reality because all materials reflect and absorb some sound. In general, materials having absorption coefficients less than 0.15 are considered to be reflective and those having absorption coefficients greater than 0.4 are considered to be absorptive.


As you can see our Testing report show that our products have a very good performance in a large range of application.


 

Bunge-Best Acoustic Panels Cheap Fireproof Veneer Ceiling Sound Absorbing Wall

Technical Information
     Product Type   Grooved Wood Acoustic Panel
     Standard Model   59/5 60/4 28/4 29/3 13/3 14/2 
     Non-Standard Model   40/3 38.5/4 18/3 17/4 8/3 8/2 5/3 6/2
     Material    High qulity MDF board
     Basic Material

   General, Economic, Fireproof, Moisture-proof, Composite,

   Magnesium, solid wood etc.

     Finish

   Melamine, Natural Wooden Veneer, Fireproof board, Painting,  

   Metal, Technology veneer, Leather etc.

     Color    Color chart or customized
     Size   133*2440 mm / 197*2440 mm
     Thickness   12mm / 15mm / 18mm
     Fireproof Grade   A2
     ECO Grade   E1
     Application

   Gymnasium ,Meerting room,multi-function hall, auditorium,

   Conference room, Banquet hall,etc.

Bunge-Best Acoustic Panels Cheap Fireproof Veneer Ceiling Sound Absorbing Wall-1

Wooden Grooved Acoustic Panels Applications

1. Professional space for timbre effect and decoration: Studio, recording room, listening room, rehearsal hall etc.

 

2. Recreational place for sound effect and decoration:Theater,cinema,indoor gymnasium, disco,KTV etc.

 

3. Sound-absorbing place for secret or privacy and decoration:Meeting room, office,hall and hotel etc.

 

4. Noisy industry for health and environmental protection:Airport,railway, bus station,factory and workshop etc.


Bunge-Best Acoustic Panels Cheap Fireproof Veneer Ceiling Sound Absorbing Wall-2

Grooved Wall Panels Finishes

BUNGE wooden grooved acoustic wall panels are available in three main finishes, Wood Veneer, High quality paint finish, and decorative Laminate. This gives the designer almost an unlimited choice in designing the wall or ceiling finish. The grooved acoustic wall panels range includes standard wood veneers chosen from the most popular colours available, as is the same with the High quality decorative laminates.

 

REAL WOOD VENEER

 

The standard range of wood veneers is available on an exstock basis, however Tengfei can choose from international suppliers quality veneers to match your choice

 

Paint Finish

 

BUNGE wooden grooved acoustic panels are available in either Pantone or RAL colours. This gives almost an unlimited choice in selection. The paint finish is in a high quality 2pac finish and can be supplied in Gloss, Matt or Satin finishes.


Bunge-Best Acoustic Panels Cheap Fireproof Veneer Ceiling Sound Absorbing Wall-3


Installation Methods

1> First fix the aluminum profile onto the wooden frame or bottom board, and their distance suggested 6about 600mm.

 

2> Filled the 32-64kg/m density acoustic foam among aluminum profiles.

 

3> Use the clips to fix the perforated acoustic panel to the aluminum profile.

 

4> When install several acoustic panel, the distance between noses to noses suggested 2-3mm.

 

5> If install the acoustic panel in the horizontal way, then the notch of the panel should face down, and it need to be fixed tight with clips. After that install pieces and pieces of acoustic panel onto the lowest one.



Bunge-Best Acoustic Panels Cheap Fireproof Veneer Ceiling Sound Absorbing Wall-4



Company Features
1. Bunge has built the brand image in both domestic and foreign markets.
2. acoustic panel material technology is not only good for improvement of quality but also quantity for sound absorbing panels.
3. Guangdong Bunge Building Material Industrial Co.,Ltd guarantee high quality office soundproofing panels service for its costumers. Get quote!
Favorable rate
100%
Buyer impression
This product has no buyer impression
  • All reviews(0)
  • Praise (0)
  • Average (0)
  • Bad review (0)
Product Message
社媒暂无评论
Chat Online 编辑模式下无法使用
Chat Online inputting...