Home  >  Quality PRODUCTS For sell  >  Certificated Acoustic Panels Factory  >  Top Grooved Wooden Acoustic Panels Company  > 

acoustic panel material grooved material Bulk Buy diffuser Bunge

acoustic panel material grooved material Bulk Buy diffuser Bunge

acoustic panel material grooved material Bulk Buy diffuser Bunge
  • acoustic panel material grooved material Bulk Buy diffuser Bunge
  • acoustic panel material grooved material Bulk Buy diffuser Bunge
  • acoustic panel material grooved material Bulk Buy diffuser Bunge
  • acoustic panel material grooved material Bulk Buy diffuser Bunge
  • acoustic panel material grooved material Bulk Buy diffuser Bunge

acoustic panel material grooved material Bulk Buy diffuser Bunge

Model
BG grooved wall panels
Brand Name
BUNGE
Year of Establishment
2011
Original
Guangzhou,China
Payment Terms
T/T is common for us. Western union is also ok
Delivery Time
15-30 days based on the different places
Supply Ability
50000 square meters
MOQ
No MOQ
Packing Details
Paper carton, or as requested.
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Product name: Grooved wooden acoustic panels
Feature: Sound absorption
Finish: Melamine,veneer
Application: Exhibition hall,banquet hall,conference hall,etc.
General use: Sound absorbing materials
Material: MDF
Function: Noise reduction
Size: 2440*133 mm, 2440*197 mm
Color: Can be customized
Style: Modern
Enterprise Strength
  • Guangdong Bunge Building Material Industrial Co.,Ltd has a group of experienced and professional technical talents. They are truth-seeking, practical, and innovative. They actively make progress and constantly seek innovation. It is their commitment to writing a glorious chapter for our company with wisdom and ability.
  • Guangdong Bunge Building Material Industrial Co.,Ltd insists on the principle to be honest, practical, and efficient. We continue to accumulate experience and improve service quality, so as to win praise from customers.
  • Guangdong Bunge Building Material Industrial Co.,Ltd's tenet is 'integrity, pragmatism, innovation, high efficiency'. The quality policy is to survive with credibility and develop with quality'. Based on the market and sincerity-based management, we look forward to working with customers and creating a win-win situation.
  • In the past years, Guangdong Bunge Building Material Industrial Co.,Ltd has never been afraid of making mistakes and has been constantly making progress. We have gradually developed into a supplier for many enterprises, from a small company with little popularity. Now we enjoy a relatively high recognition and reputation in the Manufacturing Decoration Materials industry.
  • In addition to the domestic major cities, Guangdong Bunge Building Material Industrial Co.,Ltd sells movable walls to Southeast Asia, Europe, America, Europe, and other countries and regions.
Application Scope
Guangdong Bunge Building Material Industrial Co.,Ltd's folding partition can be used in multiple industries and fields.Guangdong Bunge Building Material Industrial Co.,Ltd always adheres to the service concept to meet customers' needs. We are committed to providing customers with one-stop solutions that are timely, efficient and economical.Guangdong Bunge Building Material Industrial Co.,Ltd learns from domestic and foreign advanced management concepts and production techniques. We run a strict and perfect procurement chain and select solid and durable materials to produce movable walls. Compared with similar products, they are stronger in hardness, higher in toughness, and longer in service life. They are affordable, attracting many buyers.
  • Bunge-Sound Absorbing Wall Panels Mdf Decorative Acoustic Wooden Grooved Ceiling
Company Advantages
1. Bunge acoustic panel material is entirely made of well-selected materials and reliable components. It is widely used for privacy protection
2. The service life of this product is highly guaranteed by the strict test procedure which is in line with international standard. It is tested to be high performance and user-friendly. Defects will not be founded in the product after it is strictly inspected
3. The product is examined under the supervision of experienced QC experts. Every corner and edge of the product are carefully processed
4. With many good characteristics, the product successfully wins the high level of customer's satisfaction, which implies its promising market potential. It displays a gorgeous and delicate appearance
5. The product is in high demand at home and abroad thanks to its considerable economic benefits. A magnetic strip is applied to the product to ensure strong functionality

MDF Decorative Acoustic Wooden Grooved Ceiling Wall Panels for Interior Sound Absorption

Grooved Wall Panels Details


Wooden timber acoustic panel introduced the advanced production equipment, according to the principle of acoustic design and has good sound absorption effect, make the reverberation time reach home of the acoustical design standard,make the sound more clear,smooth,rich stereo feeling,have all kinds of optional finishes and base material,is applicable to both solid wood decorative effect and heat preservation requirements,there is a requirement for acoustic reverberation and all kinds of games. 


Base material is commonly used for MDF (optional fire density board or other specified base material), veneer can 
choose naturalwood veneer, melamine, spray paint, fire prevention board, etc., USES the German import freudenberg fire sound-absorbing glued on the back.

Specification  Groove 3mm, Center to Center 32mm
NRC 0.8
Eco-friendlyE0
FireproofA2
InstallationAluminum keel and clips, wood frame, gun nail



 

Bunge-Soundproof Wall Panels, Mdf Decorative Acoustic Wooden Grooved Ceiling

Technical Information
Product name
Wooden Grooved Acoustic Panel
Material
MDF, magnesium board, pottery aluminium board, etc
Color
Kinds of color can be customized
Size
128*2440mm, others can be customized
Thickness
12mm, 15mm, 18mm, others can be customized
Shape
Strip
Finish
Solid wood, Aluminum plate, UV spray printed
Features
Fireproof, decoration, soundproof, sound diffusion
Fireproof
A grade for ceramic aluminium board, B1 grade for MDF.
Environmental
E1 grade
Applications
Stadium, auditorium, multi-functional hall, meeting room, studio and any other places where seek for high acoustic requirements.
Shipment
By sea or air
Delivery time
7-15 working days after receiving your payment
Payment
T/T

Bunge-Soundproof Wall Panels, Mdf Decorative Acoustic Wooden Grooved Ceiling-1

Wooden Grooved Acoustic Panels Applications

1. Professional space for timbre effect and decoration: Studio, recording room, listening room, rehearsal hall etc.

 

2. Recreational place for sound effect and decoration:Theater,cinema,indoor gymnasium, disco,KTV etc.

 

3. Sound-absorbing place for secret or privacy and decoration:Meeting room, office,hall and hotel etc.

 

4. Noisy industry for health and environmental protection:Airport,railway, bus station,factory and workshop etc.


Bunge-Soundproof Wall Panels, Mdf Decorative Acoustic Wooden Grooved Ceiling-2

Grooved Wall Panels Finishes

BUNGE wooden grooved acoustic wall panels are available in three main finishes, Wood Veneer, High quality paint finish, and decorative Laminate. This gives the designer almost an unlimited choice in designing the wall or ceiling finish. The grooved acoustic wall panels range includes standard wood veneers chosen from the most popular colours available, as is the same with the High quality decorative laminates.

 

REAL WOOD VENEER

 

The standard range of wood veneers is available on an exstock basis, however Tengfei can choose from international suppliers quality veneers to match your choice

 

Paint Finish

 

BUNGE wooden grooved acoustic panels are available in either Pantone or RAL colours. This gives almost an unlimited choice in selection. The paint finish is in a high quality 2pac finish and can be supplied in Gloss, Matt or Satin finishes.


Bunge-Soundproof Wall Panels, Mdf Decorative Acoustic Wooden Grooved Ceiling-3


Installation Methods

1> First fix the aluminum profile onto the wooden frame or bottom board, and their distance suggested 6about 600mm.

 

2> Filled the 32-64kg/m density acoustic foam among aluminum profiles.

 

3> Use the clips to fix the perforated acoustic panel to the aluminum profile.

 

4> When install several acoustic panel, the distance between noses to noses suggested 2-3mm.

 

5> If install the acoustic panel in the horizontal way, then the notch of the panel should face down, and it need to be fixed tight with clips. After that install pieces and pieces of acoustic panel onto the lowest one.



Bunge-Soundproof Wall Panels, Mdf Decorative Acoustic Wooden Grooved Ceiling-4



Company Features
1. Due to continuous innovation, Guangdong Bunge Building Material Industrial Co.,Ltd has become an advanced company in the field of sound absorbing panels.
2. All production equipment in Guangdong Bunge Building Material Industrial Co.,Ltd are fully advanced in the soundproof wall panels industry.
3. Over the years, Guangdong Bunge Building Material Industrial Co.,Ltd has been consistent in providing honest services for every customer. Check now!
Favorable rate
100%
Buyer impression
This product has no buyer impression
  • All reviews(0)
  • Praise (0)
  • Average (0)
  • Bad review (0)
Product Message
社媒暂无评论
Chat Online 编辑模式下无法使用
Chat Online inputting...