EBUNGE  > 

AI - Page Sitemap

 > 

acoustic movable walls factory direct supply for hotel

acoustic movable walls factory direct supply for hotel

Acoustic movable walls factory direct supply for hotel

Model
85 mm sound proof partition
Brand Name
EBUNGE
Original
Guangzhou,China
Payment Terms
T/T or western Union
Delivery Time
15-20 days
Supply Ability
50000 square meters per month
MOQ
No MOQ,small quantity welcomed
Packing Details
Paper carton, outside with wooden boxes
OEM/ODM
Accept
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Product name: Meeting Room Partition Walls
Feature: sound proof
Finish: Melamine
Application: Conference room partitions
General use: Office furniture
Material: MDF+Aluminum
Sample: Free
Height: 2 - 6 meters
Based board: 9 mm MDF Board
Thickness: 85 mm(3 1/4 Inch)
Function: Divide space
Size: Partition walls customized
Color: Optional
Style: Folding and sliding

Acoustic Moveable Meeting Room Partition Walls FoldableWalls for Conference Room


Finished Project


Thanks for the trust from the client who comes from India.

This banquet hall operable partition walls project finished and delivered in March,2018.

Totally 4 sets of walls. Height:3.76 meters. 185 square meters. 


Our technician also went to project to supervise the installation. After installing the tracks system well, our technician came back and the client need us to do the pocket door for him.

Finish: Melamine Surface. Color Chart: CS-3061F.

acoustic movable walls factory direct supply for hotel-1

acoustic movable walls factory direct supply for hotel-2

acoustic movable walls factory direct supply for hotel-3

acoustic movable walls factory direct supply for hotel-4


Sound proof partitions technical information


Series

BG65

BG85

BG100 

Panel suspension

Top hung only

Top hung only

Top hung only

Panel thickness

65mm

85mm

100mm

Max height

4000mm

6000mm

18000mm

Panel width

500-1200 mm

500-1200 mm

500-1200 mm

Face material

9mm

9mm

12 mm

Pass doors

Single door or Double door

Sound insulation

20-32dB Rw

28-36dB Rw

32-50dB Rw

Finish Material

Plywood, MDF, Laminate, Melamine, Gypsum board, Fabric, Leather, Insulation board, Fireproof board, Wall paper, 

Vinyl, Painting, etc.  (Customized)

acoustic movable walls factory direct supply for hotel-5


 Meeting Room Partition Wallsfeatures


1. The  meeting room partition walls is a hanging system, which have the ceiling rails, but have no floor reails. So it will not damage the floor or carpet at the project site.

2. All of the meeting room partition wallscan be customized, such as the size, the colors and the surfaces.

3. The  meeting room partition walls can help you divide a big space into 2 or more smaller rooms. When you do not use them, they can be parked to the parking zone conveniently and quickly.

4. The operation is very easy, 1 person can finish the whole operation.

5. More than 60 kinds of colors to choose.

6. Different surfaces also available. Such as the MDF, Plywood, Melamine, Veneer, Fabric and Leather surface.

7. Single or Double Pass Door also available, which can help you come in and out easily.

acoustic movable walls factory direct supply for hotel-6


Related products


1.  Movable partition walls, operable walls, movable doors, acoustic room dividers, sound proof partitions.

2. Office furniture: office workstations, office chairs, conference chairs, stackable conference tables.

3. Glass partitions: movable glass partitions or fixed glass partitions for office or conference room also available.

4. Partition walls accessories: partition walls tracks and wheels.

acoustic movable walls factory direct supply for hotel-7


 Meeting Room Partition Walls packaging 


A short time of production-ONLY 5-7 DAYS


Quick and Safe Shipping


Package by Wooden Boxes

acoustic movable walls factory direct supply for hotel-8


About us

Guangdong Bunge Building Material Industrial Co.,Ltd is a professional company in manufacturing Movable Partition Walls System. We are the real manufacturer, we have our own factory and showroom in Guangzhou, China, which covers an area over 3000 m². And we have around 10 years experience in it. There is a ultra-high system sample in our factory, over 8 meters. Every client who came to our factory was amazing in it. BUNGE Factory is always providing the clients with nice quality and competitive price movable wall system, and we are so strict to inspect the quality before delivering. So far, we have exported to USA, Australia Uganda, Lebanon, Sri-Lanka, Saudi Arabia, Philippines and many other countries. 

As a professional manufacturer, we not only produce, we also design, deliver and have the after-sales service for clients. If the client need installation service, we also can send our technicians to supervise the installation. In addition, we also can supply free design to every client and we will reply in 12 hours if the clients have any questions.

acoustic movable walls factory direct supply for hotel-9





The raw material used for the EBUNGE residential movable walls is procured from some of the reliable vendors. Featuring corrosion resistance, it well protects the phones from liquid damage
EBUNGE residential movable walls is manufactured by the latest materials as we always keep track of the latest technological developments. The product allows complete access to the touch screen
With the support of our skilled professionals, EBUNGE movable walls is manufactured using fine production method. The product is easy and quick to install
EBUNGE movable walls is designed by the professional and innovative design team. The product allows complete access to the touch screen
EBUNGE movable walls is fabricated using optimum quality raw materials and pioneering technology. Replacing it will not affect phone usage in any manner
The efforts of our team finally worked out to produce movable walls with residential movable walls. It protects each part of the phones against drops as well as any other impact damage
Compared with other residential movable walls, movable walls exhibited features like residential movable walls. Its low thermal conductivity makes it ideal for people who work in high temperatures
movable walls is the mainly trendy characteristics in residential movable walls industry. This product is available in a variety of sizes to fit different phone models
residential movable walls offers the benefit of superior performance and residential movable walls. It provides phones with both protection and stylish appearance
movable walls is well easily cleaned. This product keeps the mobile phones safe while users carry them
Guangdong Bunge Building Material Industrial Co.,Ltd has the ability to coordinate comprehensively and to respond to the movable walls market rapidly. It provides maximum protection against dust, dirt, and bumps
Perfect inner management system and modern production base is good basic for goods quality movable walls of Guangdong Bunge Building Material Industrial Co.,Ltd. It helps protect phones further against normal wear and tear
In the movable walls industry, EBUNGE now is a leading manufacturer in the market. The product can minimize the damage from minor accidental drops
Guangdong Bunge Building Material Industrial Co.,Ltd is a professional manufacturer and exporter that is concerned with the design,development and production of movable walls and movable walls. It protects each part of the phones against drops as well as any other impact damage
Guangdong Bunge Building Material Industrial Co.,Ltd has achieved long-term development in residential movable walls industry in recent years. The product has an advantage of heat dissipation
Product Message
Chat Online 编辑模式下无法使用
Chat Online inputting...