Home  >  Quality PRODUCTS For sell  >  Best Movable Walls Factory  >  Hot Folding Partitions Company  > 

acoustic gym track retractable Bunge Brand folding wall supplier

acoustic gym track retractable Bunge Brand folding wall supplier

acoustic gym track retractable Bunge Brand folding wall supplier
  • acoustic gym track retractable Bunge Brand folding wall supplier
  • acoustic gym track retractable Bunge Brand folding wall supplier
  • acoustic gym track retractable Bunge Brand folding wall supplier
  • acoustic gym track retractable Bunge Brand folding wall supplier
  • acoustic gym track retractable Bunge Brand folding wall supplier
  • acoustic gym track retractable Bunge Brand folding wall supplier
  • acoustic gym track retractable Bunge Brand folding wall supplier
  • acoustic gym track retractable Bunge Brand folding wall supplier
  • acoustic gym track retractable Bunge Brand folding wall supplier
  • acoustic gym track retractable Bunge Brand folding wall supplier

acoustic gym track retractable Bunge Brand folding wall supplier

Model
85 mm operable partition walls
Brand Name
BUNGE
Year of Establishment
2011
Original
Guangzhou,China
Payment Terms
T/T is most common for us,others are also ok
Delivery Time
8-12 days
Supply Ability
5000 square meters per month
MOQ
No MOQ
Packing Details
Carton package,outside with wooden boxes
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Product name: Operable walls
Feature: Sound proofing
Aluminium frame thickness: 2 - 15 meters
Partition material: 800 - 1200 mm
Finish: Melamine,fabric,leather
Application: Hotel,banquet hall,conference hall,etc.
General use: Office furniture
Material: 100% Polyester Fiber
Function: Fireproof and eco-friendly
Size: 9mm*1220mm*2440mm
Color: Can be customized
Style: Sliding
Product Comparison
Bunge Building Decoration Engineering has great production capability and excellent technology. We also have comprehensive production and quality inspection equipment. movable walls has fine workmanship, high quality, reasonable price, good appearance, and great practicality.This durable movable walls are made of solid materials. They have strong resistance to wear, corrosion, and radiation. They live up to the national quality control standards and enjoy high recognition in the market.Compared with other same kind of products, movable walls produced by Bunge Building Decoration Engineering has the following advantages and features.
  • Bunge-Professional Folding Partition Meeting Room Partition Walls Manufacture
    v s
    Bunge-Professional Folding Partition Meeting Room Partition Walls Manufacture-1
Company Advantages
1. Lean production method is adopted to produce Bunge folding panel partition to achieve high efficiency, low production cost, and short lead time. The product finds its wide use in the banquet hall, conference room, office, etc
2. folding wall is equipped with a super higher quality materials providing a maximum dividers folding partitions for users. It adopts the convenient hanging system without the floor track
3. Guangzhou Bunge Building Decoration Engineering Co., Ltd has the most knowledgeable experts and reliable, easy-to-use products. Defects will not be founded in the product after it is strictly inspected


Soundproof Acoustic Operable Partition Walls For School,Classroom and Meeting Room

Bunge-Professional Folding Partition Meeting Room Partition Walls Manufacture

BUNGE FACTORY OFFER YOU

1: FACTORY DIRECT PRICE.
2: NICE QUALITY.
3: QUICK SHIPPING WITHIN 5 DAYS.
4: SUPPORT CUSTOMER DESIGNS. 
5: NO MOQ, SMALL ORDER WELCOME.
6: MORE THAN 3 YEARS WARRANTY.


Nice Price Products

FACTORY DIRECT PRICE--NICE QUALITY--NICE SERVICE--QUICK SHIPPING.

 

65 mm operable partition walls ONLY FOR $85.

 

85 mm operable partition walls ONLY FOR $98.

 

100 mm operable partition walls ONLY FOR $118.

 

125 ultra-high system operable partition walls ONLY FOR $130.

 

Please contact us for the Detailed Price.

Bunge-Professional Folding Partition Meeting Room Partition Walls Manufacture-1

Product Description


  •   Reinforced aluminium frame construction for demanding condition.

  •      Wide range of operable partitions walls surface finishes and colors.

  •   Single or double passdoor enabling access to neighbouring rooms.

  •     The operable partition walls stacking can be one or both ends.

  •     Top hung and floor with rubber seals achieving excellent soundproof effect.

  •    Various levels of soundproof reduction.

Bunge-Professional Folding Partition Meeting Room Partition Walls Manufacture-2
Bunge-Professional Folding Partition Meeting Room Partition Walls Manufacture-3
Technical Details
SeriesBG65BG85BG100
Panel suspensionTop hung onlyTop hung onlyTop hung only
Panel thickness65mm85mm100mm
Max height4000mm6000mm18000mm
Panel width500-1200 mm500-1200 mm500-1200 mm
Face material9mm9mm12 mm
PassdoorsSingle door or Double door
Sound insulation28-38dB Rw28-42dB Rw32-50dB Rw
Finish MaterialPlywood, MDF, Laminate, Melamine, Gypsum board, Fabric, Leather, Insulation board, Fireproof board, Wall paper, Vinyl, Painting, etc.(Customized)

Bunge-Professional Folding Partition Meeting Room Partition Walls Manufacture-4

Components of Operable Partition Walls

Tracks: Made of good quality anodized aluminium 6063-T5 materials,hanging the meeting room operable partition walls cost panels with wheels.

Wheels/Rollers:  It is the carrier for the meeting room operable partition walls,let panels move more flexibly.Pulley bearing is more than 1600 KGS.

Connectors: Made of anodized aluminium 6063-T5 aluminum tracks,“L”, “T”, “+”types are available.

Rubber/vinyl seal: Made of Nitrile Butadiene Rubber(NBR+PVC),durable and perfect for sound insulation,wear-resistant.

Rock Wool: Density of 60kg/m3,help us reduce the noise and heat.

Handle: Operate the retractable being up and down.

Retractable mechanism: Control the movement of the top and bottom seal to form a excellent sound insulation performance.

Magnetic Strip: Ferrite plastic magnetic material will be used in aluminum profiles to enhance acoustic performance of meeting room operable partition walls.

MDF board: 9 mm thickness,density of 760kg/m3,absorbent thickness expansion rate is less than 15%.Formaldehyde emission is 34mg/100g.


Bunge-Professional Folding Partition Meeting Room Partition Walls Manufacture-5
Bunge-Professional Folding Partition Meeting Room Partition Walls Manufacture-6
Bunge-Professional Folding Partition Meeting Room Partition Walls Manufacture-7

Parking Styles of Operable Partition Walls

As you know, when we do not use the meeting room operable partition walls, we can park them to the parking area. Actually there are many parking styles for the meeting room operable partitions, all of the clients can choose the suitable one and we can adjust based on their own project site. If you need some pocket doors to hide the panels, BUNGE Factory also can produce for you.


Bunge-Professional Folding Partition Meeting Room Partition Walls Manufacture-8
Bunge-Professional Folding Partition Meeting Room Partition Walls Manufacture-9
Bunge-Professional Folding Partition Meeting Room Partition Walls Manufacture-10



Different Finishes of Operable Partitions Walls
  • ❶   Wooden (MDF, Plywood bare raw finish)    (Melamine, Veneer)

  • ❷   Fabric (fabric with mdf board hard covers)    (fabric with sponge soft covers)

  • ❸  Leather (leather with mdf hard covers)    (leather with sponge soft covers)

  • ❹  Wallpaper, Vinyl, Fireproof board

  • ❺   Acoustic panels

  • ❻   Tempered glass, mirror etc.

Bunge-Professional Folding Partition Meeting Room Partition Walls Manufacture-11
Bunge-Professional Folding Partition Meeting Room Partition Walls Manufacture-12
Bunge-Professional Folding Partition Meeting Room Partition Walls Manufacture-13
Action Now

1.Buy 30 square meters Get 5% Discount.


2.Buy 80 square meters Get 10% Discount.


3.Get a FREE SAMPLE.


4.Support a 3 YEARS WARRANTY.


5.To be general, BUNGE Factory has 10+ years experience in the line of meeting room operable partition walls. The operable partitions we produced can divide the space speedy and conveniently. Due to their flexibility and cost effectiveness, now more and more clients need them to divide a large room. Also the operable partition walls are widely used in office buildings, meeting room, hotel, banquet hall, conference and function halls, church, classroom and so on. Would you like to get a free design? Welcome to contact us at any time.

Bunge-Professional Folding Partition Meeting Room Partition Walls Manufacture-14



Company Features
1. Guangzhou Bunge Building Decoration Engineering Co., Ltd specializes in the production of folding wall in medium and high standard quality.
2. Guangzhou Bunge Building Decoration Engineering Co., Ltd has a number of large-scale production lines for folding room dividers.
3. Trust Bunge and we will ensure that you gain expertise and value. Please contact.
Favorable rate
100%
Buyer impression
This product has no buyer impression
  • All reviews(0)
  • Praise (0)
  • Average (0)
  • Bad review (0)
Product Message
社媒暂无评论
Chat Online 编辑模式下无法使用
Chat Online inputting...