Acoustic Folding Room Partitions Prices on Wheels Movable Partition Walls Cost
To be general, BUNGE Factory has 10+ years experience in the line of movable partition walls. The movable partition walls we produced can divide the space speedy and conveniently. Due to their flexibility and cost effectiveness, now more and more clients need them to divide a large room. Also the movable partition walls are widely used in office buildings, meeting room, hotel, banquet hall, conference and function halls, church, classroom and so on. Would you like to get a free design? Welcome to contact us at any time.
FACTORY DIRECT PRICE--NICE QUALITY--NICE SERVICE--QUICK SHIPPING.
65 mm movable partition walls ONLY FOR $85.
85 mm movable partition walls ONLY FOR $98.
100 mm movable partition walls ONLY FOR $118.
125 ultra-high system movable partition walls ONLY FOR $130.
Please contact us for the Detailed Price.
WhatsApp:008613928983277
The movable partition walls consist of a series of concave/convex profile interlocking flat panels and the fast set retractable top and bottom seals ,its provide excellent acoustic insulation property of from STC-32 to 53 in laboratory setting.
Its high performance per dollar value and the easiest in-field operation makes it very suitable for Hotel, banquet hall, conference room ,ballroom, muti-function hall, restaurant,classroom,office,religion,dance studio ,shopping arcades and many other place where seek for space divide with good soundproof performance.
There are wide of range face finishes are available :melamine faced MDF or plywood, fabric, carpet, fabric, artificial, leather,wood veneer, high pressure laminate,Formica ,acoustic panel,white boad ect., Panels can also be supplied unfinished for field decoration,Standard frame color is clear anodized aluminum,custom powder coating colors are available.
Increasingly, flexible and efficient space utilisation is becoming a must for offices, hotels, exhibition centres, studios and similar. With our movable partition walls system, you can have more choice to arrange your space rather than a room. Is not only provide visual insulation but also sound insulation which give you a more private space, the sound insulation could be 35dB to 55dB, as well as a concreat wall.
Movable partition wall is made of high quality anodized aluminum frame with environmentally composite materials.The sliding partition walls panels move on a ceiling track with no requirement of floor guides or rails which provide you a better environment.
Series | BG65 | BG85 | BG100 |
Panel suspension | Top hung only | Top hung only | Top hung only |
Panel thickness | 65mm | 85mm | 100mm |
Max height | 4000mm | 6000mm | 18000mm |
Panel width | 500-1200 mm | 500-1200 mm | 500-1200 mm |
Face material | 9mm | 9mm | 12 mm |
Passdoors | Single door or Double door | ||
Sound insulation | 28-38dB Rw | 28-42dB Rw | 32-50dB Rw |
Finish Material | Plywood, MDF, Laminate, Melamine, Gypsum board, Fabric, Leather, Insulation board, Fireproof board, Wall paper, Vinyl, Painting, etc.(Customized) |
1.Buy 30 square meters Get 5% Discount.
2.Buy 80 square meters Get 10% Discount.
3.Get a FREE SAMPLE.
4.Support a 3 YEARS WARRANTY.
Tracks: Made of good quality anodized aluminium 6063-T5 materials,hanging the movable partition walls with wheels.
Wheels/Rollers: It is the carrier for the movable partition walls ,let panels move more flexibly.Pulley bearing is more than 1600 KGS.
Connectors: Made of anodized aluminium 6063-T5 aluminum tracks,“L”, “T”, “+”types are available.
Rubber/vinyl seal: Made of Nitrile Butadiene Rubber(NBR+PVC),durable and perfect for sound insulation,wear-resistant.
Rock Wool: Density of 60kg/m3,help us reduce the noise and heat.
Handle: Operate the retractable being up and down.
Retractable mechanism: Control the movement of the top and bottom seal to form a excellent sound insulation performance.
Magnetic Strip: Ferrite plastic magnetic material will be used in between aluminum profiles to enhance acoustic performance of the movable partition walls.
MDF board: 9 mm thickness,density of 760kg/m3,absorbent thickness expansion rate is less than 15%.Formaldehyde emission is 34mg/100g.
![]() | ![]() |
As you know, when we do not use the movable partition walls, we can park them to the parking area. Actually there are many parking styles for the movable partition walls, all of the clients can choose the suitable one and we can adjust based on their own project site. If you need some pocket doors to hide the panels, BUNGE Factory also can produce for you.
![]() | ![]() |
❶ Wooden (MDF, Plywood bare raw finish) (Melamine, Veneer)
❷ Fabric (fabric with mdf board hard covers) (fabric with sponge soft covers)
❸ Leather (leather with mdf hard covers) (leather with sponge soft covers)
❹ Wallpaper, Vinyl, Fireproof board
❺ Acoustic panels
❻ Tempered glass, mirror etc.
![]() | ![]() |
![]() | ![]() |
Copyright © 2018 Guangdong Bunge Building Material Industrial Co.,Ltd. | All Rights Reserved
Hello, please leave your name and email here before chat online so that we won't miss your message and contact you smoothly.