Accordion Home Fabric Movable Demountable Folding Partition Walls-EBUNGE
Home  > PRODUCTS  > Movable Walls  > 

Accordion Home Fabric Movable Demountable Folding Partition Walls

Accordion Home Fabric Movable Demountable Folding Partition Walls-movable wall- folding partition-operalbe wall-EBUNGE
Accordion Home Fabric Movable Demountable Folding Partition Walls-movable wall- folding partition-operalbe wall-EBUNGE
Accordion Home Fabric Movable Demountable Folding Partition Walls-EBUNGE
Accordion Home Fabric Movable Demountable Folding Partition Walls-EBUNGE
Accordion Home Fabric Movable Demountable Folding Partition Walls-EBUNGE

Accordion Home Fabric Movable Demountable Folding Partition Walls

Model
85 mm folding partitions
Brand Name
BUNGE
Year of Establishment
2011
Original
Guangzhou,China
Payment Terms
T/T is common for us. Western union is also ok
Delivery Time
15-30 days based on the different places
Supply Ability
5000 square meters
MOQ
No MOQ
Packing Details
Paper cartons, outside with wooden boxes
OEM/ODM
Accept
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Product name: Folding partition walls
Feature: Sound absorbing
Aluminium frame thickness: Aluminum alloy
Partition material: Aluminum and board
Finish: Fabric
Application: Exhibition hall,banquet hall,conference hall,etc.
General use: Commercial furniture
Material: MDF
Function: Dividing space
Size: Can be customized
Color: Can be customized
Style: Sliding door

Sliding Foldable Movable Partition Walls For Banquet Hall,Restaurant,Church

Nice Price Products

FACTORY DIRECT PRICE--NICE QUALITY--NICE SERVICE--QUICK SHIPPING.

 

65 mm folding partition walls ONLY FOR $85.

 

85 mm folding partition walls ONLY FOR $98.

 

100 mm folding partition walls ONLY FOR $118.

 

125 ultra-high system folding partition walls ONLY FOR $130.

 

Please contact us for the Detailed Price.

 

WhatsApp:008613928983277

Bunge-Best Movable Walls Accordion Home Fabric Movable Demountable Folding Partition

Product Description


  •   Extensive worldwide sales network that has proved that our folding partition walls work well worldwide.

  •   Technical advice or design is available, no matter where you located.

  •   Integrated space management and acoustic product solutions that can be more profitable and economical to use in your building environment.

  •   From your first query to the completion of the project, we are here to support.

  •   Based on years of experience in architectural and design challenges, provide industry-leading technology to solve your space problems.

  •   Unique custom applications that is flexible enough to meet the needs of any customer.

Bunge-Best Movable Walls Accordion Home Fabric Movable Demountable Folding Partition-1
Bunge-Best Movable Walls Accordion Home Fabric Movable Demountable Folding Partition-2
Technical Details
SeriesBG65BG85BG100
Panel suspensionTop hung onlyTop hung onlyTop hung only
Panel thickness65mm85mm100mm
Max height4000mm6000mm18000mm
Panel width500-1200 mm500-1200 mm500-1200 mm
Face material9mm9mm12 mm
PassdoorsSingle door or Double door
Sound insulation28-38dB Rw28-42dB Rw32-50dB Rw
Finish MaterialPlywood, MDF, Laminate, Melamine, Gypsum board, Fabric, Leather, Insulation board, Fireproof board, Wall paper, Vinyl, Painting, etc.(Customized)
Action Now

1.Buy 30 square meters Get 5% Discount.


2.Buy 80 square meters Get 10% Discount.


3.Get a FREE SAMPLE.


4.Support a 3 YEARS WARRANTY.


5.To be general, BUNGE Factory has 10+ years experience in the line of folding partition walls. The folding partition walls we produced can divide the space speedy and conveniently. Due to their flexibility and cost effectiveness, now more and more clients need them to divide a large room. Also the folding partition walls are widely used in office buildings, meeting room, hotel, banquet hall, conference and function halls, church, classroom and so on. Would you like to get a free design? Welcome to contact us at any time.

Bunge-Best Movable Walls Accordion Home Fabric Movable Demountable Folding Partition-3

Components of Folding Partition Walls

Tracks: Made of good quality anodized aluminium 6063-T5 materials,hanging the operable waalls cost panels with wheels.

Wheels/Rollers:  It is the carrier for the folding partition walls ,let panels move more flexibly.Pulley bearing is more than 1600 KGS.

Connectors: Made of anodized aluminium 6063-T5 aluminum tracks,“L”, “T”, “+”types are available.

Rubber/vinyl seal: Made of Nitrile Butadiene Rubber(NBR+PVC),durable and perfect for sound insulation,wear-resistant.

Rock Wool: Density of 60kg/m3,help us reduce the noise and heat.

Handle: Operate the retractable being up and down.

Retractable mechanism: Control the movement of the top and bottom seal to form a excellent sound insulation performance.

Magnetic Strip: Ferrite plastic magnetic material will be used in between aluminum profiles to enhance acoustic performance of the Operable Wall Partitions.

MDF board: 9 mm thickness,density of 760kg/m3,absorbent thickness expansion rate is less than 15%.Formaldehyde emission is 34mg/100g.


Bunge-Best Movable Walls Accordion Home Fabric Movable Demountable Folding Partition-4Bunge-Best Movable Walls Accordion Home Fabric Movable Demountable Folding Partition-5

Bunge-Best Movable Walls Accordion Home Fabric Movable Demountable Folding Partition-6

Parking Styles of Folding partition walls

As you know, when we do not use the folding partition walls, we can park them to the parking area. Actually there are many parking styles for the movable walls, all of the clients can choose the suitable one and we can adjust based on their own project site. If you need some pocket doors to hide the panels, BUNGE Factory also can produce for you.


Bunge-Best Movable Walls Accordion Home Fabric Movable Demountable Folding Partition-7Bunge-Best Movable Walls Accordion Home Fabric Movable Demountable Folding Partition-8

Bunge-Best Movable Walls Accordion Home Fabric Movable Demountable Folding Partition-9

Different Finishes of Folding Partition Walls
  • ❶   Wooden (MDF, Plywood bare raw finish)    (Melamine, Veneer)

  • ❷   Fabric (fabric with mdf board hard covers)    (fabric with sponge soft covers)

  • ❸  Leather (leather with mdf hard covers)    (leather with sponge soft covers)

  • ❹  Wallpaper, Vinyl, Fireproof board

  • ❺   Acoustic panels

  • ❻   Tempered glass, mirror etc.

  • Bunge-Best Movable Walls Accordion Home Fabric Movable Demountable Folding Partition-10Bunge-Best Movable Walls Accordion Home Fabric Movable Demountable Folding Partition-11

    Bunge-Best Movable Walls Accordion Home Fabric Movable Demountable Folding Partition-12

Favorable rate
100%
Buyer impression
This product has no buyer impression
  • All reviews(0)
  • Praise (0)
  • Average (0)
  • Bad review (0)
Product Message
社媒暂无评论
Chat Online 编辑模式下无法使用
Chat Online inputting...