Movable and Foldable
The Rw for acoustic insulation (acoustic rating from 32dB to 55dB) is a fundamental aspect of movable sound-insulated walls and partitions. Bunge products are manufactured in accordance with strict construction and testing criteria to give a high level of quality. (These characteristics also apply to our special products like access doors that are fitted within wall systems. Furthermore, each individual project is given special attention at the design stage so that the requested sound-insulation is always attained. )