Movable Walls Advantages

12+ Years Flexible Space Solution Experience

Movable and Foldable

 

The partition walls are hanging system.The high quality aluminum tracks and wheels can support over more than 1 ton of materials. In additional, they are sound proofing, movable and sliding, which can help you divide a big space quickly and conveniently...

  1. Design and Technology

 

Movable systems have the characteristic of being very easy to maneuver and position. This is the result of the high quality, long-lasting components. The panels have a tongue-and-grove profile designed to obtain a perfect visual, geometric and sound-insulation continuity ...

  1. Easy to Operate

 

Design and technology are the essentials of a successful alliance of partition. The transformation of a large hall into two or more sound-insulated areas which perfectly respond to the requirements of the designer and the needs of the final user without  ...

  1. Widely Application

 

The operable wall series is used wherever room space needs to be fully utilized. Hotels, conference centers, multi-function rooms, banquet halls, offices, training areas, church, classroom, meeting room, ballroom, gym, etc...

    CUSTOMIZED

 

Through our CAPABILITIES, we have more SPACE MANAGEMENts LIKE WE DO.

 

 

With years of experience, we’ve built our careers in the flexible space management —bringing unparalleled knowledge,

skill and counsel into every project to deliver exactly what’s needed.

 

Innovating flexible space solutions requires more than just skill, it requires pride and passion. In every engagement we bring a positive,can-do attitude and insatiable desire to do the best job possible for our customers...

 

 

READ MORE>>

Chat Online 编辑模式下无法使用
Chat Online inputting...