Home  >  Quality PRODUCTS For sell  >  Certificated Acoustic Panels Factory  >  Perforated Wooden Acoustic Panels Factory  > 

12 multi sound suppression panels fire Bunge company

12 multi sound suppression panels fire Bunge company

12 multi sound suppression panels fire Bunge company
  • 12 multi sound suppression panels fire Bunge company
  • 12 multi sound suppression panels fire Bunge company
  • 12 multi sound suppression panels fire Bunge company
  • 12 multi sound suppression panels fire Bunge company
  • 12 multi sound suppression panels fire Bunge company
  • 12 multi sound suppression panels fire Bunge company

12 multi sound suppression panels fire Bunge company

Model
BG perforated acoustic panels
Brand Name
BUNGE
Year of Establishment
2011
Original
Guangzhou,China
Payment Terms
T/T is common for us. Western union is also ok
Delivery Time
15-30 days based on the different places
Supply Ability
50000 square meters
MOQ
No MOQ
Packing Details
Paper carton
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Product name: Perforated acoustic panels
Feature: Sound proofing
Aluminium frame thickness: 6,9,12,15,18 mm
Partition material: Black fleece
Finish: Melamine,fabric,metal
Application: Hotel,banquet hall,conference hall,etc.
General use: Sound proofing materials
Material: MDF
Function: Fireproof and eco-friendly
Size: 2440*1220 mm, 1220*600 mm
Color: Can be customized
Style: Modern
Enterprise Strength
  • Guangdong Bunge Building Material Industrial Co.,Ltd has a professional R&D expert team and a high-quality staff team. The team members' great production capabilities make a contribution to our company's rapid development.
  • Customers' needs are the foundation for Guangdong Bunge Building Material Industrial Co.,Ltd to achieve long-term development. In order to better serve customers and further meet their needs, we run a comprehensive after-sales service system to solve their problems. We sincerely and patiently provide services including information consultation, technical training, and product maintenance and so on.
  • In the future, Guangdong Bunge Building Material Industrial Co.,Ltd will always adhere to integrity-based and customer-oriented business. Besides, we carry forward our enterprise spirit to be loyal, dedicated, and pragmatic. Based on the market, we achieve development depending on technology and innovation. We are committed to becoming a modern and competitive enterprise in the industry.
  • Guangdong Bunge Building Material Industrial Co.,Ltd was founded in . After years of pioneering and innovation, we not only accumulate rich production experience of movable walls but also enjoy a good corporate image. We are leading the new trend of development in the Manufacturing Decoration Materials all the way.
  • Guangdong Bunge Building Material Industrial Co.,Ltd's folding partition gain a high market share in the domestic market for the high quality and reasonable price.
Company Advantages
1. The production of Bunge sound suppression panels adopts the highest quality sustainable finishes and materials. Multiple accessories of the product can be provided to the customers
2. It has been widely recognized that Bunge always apply sound reducing wall panels to let our customers assured. The product is found to have good sound insulation
3. We are proud of sound deadening panels's diverse functions and original design.
4. Our quality products have a large reputation in the market. It is manufactured according to environmental protection requirements
5. The product outperforms other products well in the industry due to rising market achievements. Equipped with a sealing device, the product is praised for its tight sealing performance

Fiberglass Ceiling Board Sound And Fire Insulated Perforated Wooden Decorative Acoustic Wall Panels

Perforated Acoustic Panels Features

1.Perforated wooden acoustic panel is manufactured from 100% polyester fibers and does not contain chemical binders including formaldehyde.


2.Perforated wooden acoustic panel products contains a minimum of 75% previously recycled polyester fiber (from PET bottle flake)ensuring comparatively low embodied energy.


3.Its polyester non-woven surface is easy to be bonded and fit for most kinds of surface sheet.


4.Absorb reverberated sound, providing acoustic control to lessen the amount of noise in a room.


5.Protect and adorn your walls, providing high-impact wall protection while serving as a viscous surface, giving the same functionality as a bulletin board without sacrificing aesthetics.


6.Easy-to-install, cuts, fastens, and paints easily, less maintenance, more life;


 

Bunge-Best Acoustic Panels Office Acoustic Wall Panels From Bunge

Technical Information
Model typeE16/6,E32/6,V32/6,E35/1.5-10,V32/3-10
Size600*600,1200*600,2400*1200mm
Thickness12,15,18mm
Finishmelamine, veneer, metal finish, acrylic, PU leather,
paintUV,PU painting
Base materialStandard MDF, Eco-pine wood MDF, Fireproof MDF, Moistureproof MDF, Magnesium Composited MDF
MDF density680kg/cubic meter
Backside finishAcoustic felt, woven fabric
Fireproof gradeGB8624 2012 A,B1,B2,B3
Eco-protection gradeE0,E1
InstallationAluminum keel and clips, wood frame, gun nail
Backside hole diameter10 mm
Depth of groove7mm
Veneer type thickness0.3,0.6mm
Veneer textureMountain texture, straight line
Veneer tree speciesMaple, cherry, Oak, teak, walnut, ashtree, sabelli, birch,
CertificationBV,CE,SGS,ISO9001-2008,
Test reportEco protection, sound absorption, flame retardant

Bunge-Best Acoustic Panels Office Acoustic Wall Panels From Bunge-1

Perforated Acoustic Panels Applications

1.Studios, recording rooms, listening rooms, rehearsal rooms and more professionally interspace timbre projects.


2.Theaters, indoor gymnasiums, discos, KTV rooms and more performance and entertainment location.


3.Meeting rooms, offices, halls, hotels and more sound absorption and secrecy projects.


4.Air-port, railways, bus-stops, workshops and more noise reduction projects.


Bunge-Best Acoustic Panels Office Acoustic Wall Panels From Bunge-2

Perforated Acoustsic Panels Performance

Acoustic absorption is usually defined in terms of an absorption coefficient(usually denoted by theGreek letter alpha, α), defined as the ratio of absorbed to incident sound energy from a single interaction between a sound wave and a certain material. Absorption coefficients range from 0 to 1 and vary with frequency, α=0 means that the material absorbs no sound and reflects all sound energy incident on it.


α=1 means that the material absorbs all sound energy incident on it and reflects none. Absorption coefficients of 0 and 1 are ideal values that do not exist in reality because all materials reflect and absorb some sound. In general, materials having absorption coefficients less than 0.15 are considered to be reflective and those having absorption coefficients greater than 0.4 are considered to be absorptive.
 
As you can see our Testing report show that our products have a very good performance in a
large range of application.

Bunge-Best Acoustic Panels Office Acoustic Wall Panels From Bunge-3


Installation Methods

1> First fix the aluminum profile onto the wooden frame or bottom board, and their distance suggested about 600mm.

 

2> Filled the 32-64kg/m density acoustic foam among aluminum profiles.

 

3> Use the clips to fix the perforated acoustic panel to the aluminum profile.

 

4> When install several perforated acoustic panel, the distance between noses to noses suggested 2-3mm.

 

5> If install the perforated acoustic panels in the horizontal way, then the notch of the panel should face down, and it need to be fixed tight with clips. After that install pieces and pieces of acoustic panel onto the lowest one.



Bunge-Best Acoustic Panels Office Acoustic Wall Panels From Bunge-4


                                   Melamine ,natural wood veneer,paint,etc                                    


Company Features
1. Guangdong Bunge Building Material Industrial Co.,Ltd has been active in sound deadening panels field for decades.
2. Equipped with professional technicians, Bunge is proud of offering noise reduction panels with high performance.
3. Bunge aims to produce the best noise cancelling wall panels to offer a better user experience. Ask online!

                                   Melamine ,natural wood veneer,paint,etc                                    

Favorable rate
100%
Buyer impression
This product has no buyer impression
  • All reviews(0)
  • Praise (0)
  • Average (0)
  • Bad review (0)
Product Message
社媒暂无评论
Chat Online 编辑模式下无法使用
Chat Online inputting...