Home  > PRODUCTS  > Acoustic Panels  > Perforated Wooden Acoustic Panels  >  12 mm MDF Acoustic Ceiling and Wall Boards Soundproof Perforated Wall Panels
12 mm MDF Acoustic Ceiling and Wall Boards Soundproof Perforated Wall Panels

12 mm MDF Acoustic Ceiling and Wall Boards Soundproof Perforated Wall Panels

Model
BG perforated wall panels
Brand Name
BUNGE
Year of Establishment
2011
Original
Guangzhou,China
Payment Terms
T/T is common for us. Western union is also ok
Delivery Time
15-30 days based on the different places
Supply Ability
50000 square meters
MOQ
No MOQ
Packing Details
Paper carton
Product name: Perforated wall panels
Feature: Sound proofing
Aluminium frame thickness: 12,15,18 mm
Partition material: Black fleece
Finish: Melamine,fabric,metal
Application: Hotel,banquet hall,conference hall,etc.
General use: Sound proofing materials
Material: MDF
Function: Fireproof and eco-friendly
Size: 2440*1220 mm, 1220*600 mm
Color: Can be customized
Style: Modern

12 mm MDF Acoustic Ceiling and Wall Boards Soundproof Perforated Wall Panels

Perforated Wall Panels Features

1 Perforated wall panel  is a kind of resonance absorption material with holes through on the quality MDF board.


2 Perforated wall panel has strong selection on the sound spectrum and particular great performance on the middle and low frequency.


3 Perforated wall panels filled with the acoustic cotton at the back side space of the acoustic panel, it has better performance on the middle and high frequency.


4 The holes diameter and pitch can be custom made.


5 Strong impact resistance, excellent decorate performance, elegant color, especially work for wooden construction.


 

Bunge-Quality Sound Deadening Panels Acoustic Panels For Noise Reduction

Technical Information
Model typeE16/6,E32/6,V32/6,E35/1.5-10,V32/3-10
Size600*600,1200*600,2400*1200mm
Thickness12,15,18mm
Finishmelamine, veneer, metal finish, acrylic, PU leather,
paintUV,PU painting
Base materialStandard MDF, Eco-pine wood MDF, Fireproof MDF, Moistureproof MDF, Magnesium Composited MDF
MDF density680kg/cubic meter
Backside finishAcoustic felt, woven fabric
Fireproof gradeGB8624 2012 A,B1,B2,B3
Eco-protection gradeE0,E1
InstallationAluminum keel and clips, wood frame, gun nail
Backside hole diameter10 mm
Depth of groove7mm
Veneer type thickness0.3,0.6mm
Veneer textureMountain texture, straight line
Veneer tree speciesMaple, cherry, Oak, teak, walnut, ashtree, sabelli, birch,
CertificationBV,CE,SGS,ISO9001-2008,
Test reportEco protection, sound absorption, flame retardant

Bunge-Quality Sound Deadening Panels Acoustic Panels For Noise Reduction-1

Perforated Wall Panels Applications

We specialize in full range of acoustic and decorative materials, such as wood wool acoustic panel, wooden timber acoustic panel, polyester fiber acoustic panel, fabric acoustic panel, carved panel, decorative panel, waved panel, diffuser, bass trap, etc. In addition, we also produce the movable partition walls,glass partitions,office furniture and some aluminum profiles.

 

The perforated wall panels are widely used in the music hall, opera house, theater, cinema,Multifunctional hall, KTV, as well as art gallery, hotel, library, etc. Which needs sound Effect requirements and high grade decoration tastes of the public facilities And cultural venues, etc.



Bunge-Quality Sound Deadening Panels Acoustic Panels For Noise Reduction-2

Perforated Wall Panels Performance

Acoustic absorption is usually defined in terms of an absorption coefficient(usually denoted by theGreek letter alpha, α), defined as the ratio of absorbed to incident sound energy from a single interaction between a sound wave and a certain material. Absorption coefficients range from 0 to 1 and vary with frequency, α=0 means that the material absorbs no sound and reflects all sound energy incident on it.


α=1 means that the material absorbs all sound energy incident on it and reflects none. Absorption coefficients of 0 and 1 are ideal values that do not exist in reality because all materials reflect and absorb some sound. In general, materials having absorption coefficients less than 0.15 are considered to be reflective and those having absorption coefficients greater than 0.4 are considered to be absorptive.
 
As you can see our Testing report show that our products have a very good performance in a
large range of application.

Bunge-Quality Sound Deadening Panels Acoustic Panels For Noise Reduction-3


Installation Methods

1> First fix the aluminum profile onto the wooden frame or bottom board, and their distance suggested about 600mm.

 

2> Filled the 32-64kg/m density acoustic foam among aluminum profiles.

 

3> Use the clips to fix the perforated acoustic panel to the aluminum profile.

 

4> When install several perforated acoustic panel, the distance between noses to noses suggested 2-3mm.

 

5> If install the perforated acoustic panels in the horizontal way, then the notch of the panel should face down, and it need to be fixed tight with clips. After that install pieces and pieces of acoustic panel onto the lowest one.



Bunge-Quality Sound Deadening Panels Acoustic Panels For Noise Reduction-4


                                   Melamine ,natural wood veneer,paint,etc                                    

                                   Melamine ,natural wood veneer,paint,etc                                    

Product Message
社媒暂无评论
Contact
/* 客户要求添加的 */